A two-person crew uses a laser to align components in the Beam Transport Hall.
A section of LCLS hardware in the BTH with the vacuum chamber (beam pipe) installed.
The yellow support pedestals, along with quadrupole magnets and vacuum chamber (beam pipe), constitute the linac-to-undulator section of the LCLS.