Bldg 40 and 84 Parking Lots Closed
Start: 10/9/2008
End: 2/28/2009
The parking lots behind Building 40 and Building 84 will remain closed through completion of construction activities. The Bldg. 40 loading dock parking lot will be closed through the end of 2010 for PULSE. The Bldg. 84 loading dock parking lot will be closed through the end of February 2009 in order to support the ongoing pipe project.
Date Posted: 10/9/2008
|