Partial close of south side of Loop Road between South Target Road to B 033
Start: 5/27/2008 7:00:00 AM
End: 7/14/2008 4:00:00 PM
Sidewalk Project:
Sidewalk on the southside of Loop Road between South Target Road and B 033 will be constructed. Construction will start on 5/27/2008 and estimated completion date is 7/14/2008. One lane of this section will be closed during construction.
Date Posted: 5/22/2008
|