SLAC Today logo

Access [see all | submit an access notice Locked]

Partial close of south side of Loop Road between South Target Road to B 033

Start: 5/27/2008 7:00:00 AM

End: 7/14/2008 4:00:00 PM

Sidewalk Project: Sidewalk on the southside of Loop Road between South Target Road and B 033 will be constructed. Construction will start on 5/27/2008 and estimated completion date is 7/14/2008. One lane of this section will be closed during construction.

Date Posted: 5/22/2008


Last update: