A&E ADA Restroom Project
Start: 1/27/2007 8:00:00 AM
End: 1/27/2007 5:00:00 PM
On Saturday, January 27th, Panel 'B' in the South Hall of the second floor of B041 will be shutdown to allow a tie-in and the addition of a breaker to feed the ADA automation of the lobby door. This will shut power-off to the entire South side of B041 on the second floor. Panel 'B' is fed from the MCC on the first floor, room 126, breaker #3. This feeds a step-down transformer which has a remote and local disconnect feeding 2PCC1A3-03 local panel and other local panels. This may mean that more than the south side of the building 041 on the second floor will be affected. The electrical work plan will be developed to ensure personnel safety.
The work is being done on Saturday to affect as few people as possible. Please inform anyone who might need power in that area of the building. It will be shutdown for that Saturday. There maybe other areas that are affected. Once the electrical work plan is developed, a more clear area that is affected will be established.
Date Posted: 1/22/2007
|