Bldg 084 Parking Spaces Closure
Start: 9/14/2006 5:30:00 PM
End: 12/17/2006 5:00:00 PM
Beginning Friday morning, September 15th, construction on the GLAST ISOC facility will be taking place in Building 084. A construction debris dumpster will be located behind the building in the loading dock area and will take up a row of parking spaces. We are working to minimize the impact to the highest degree possible.
Date Posted: 9/13/2006
|