SLAC Today logo

Access [submit an access notice Locked]

Current and upcoming site access notices

Start End Details
9/6/2006 8:00:00 AM 9/1/2008 5:00:00 PM Alpine Gate Closed
9/6/2006 8:00:00 AM 9/1/2008 5:00:00 PM Research Yard Bisected
9/6/2006 8:00:00 AM 9/1/2008 5:00:00 PM Gates 17 & 30 open 24 hours, 7 days a week
9/8/2006 8:00:00 AM 9/22/2008 5:00:00 PM PEP Ring Road closed
5/5/2008 6:00:00 AM 5/31/2008 9:00:00 PM Loop Road traffic restrictions and partial closure
5/19/2008 7:00:00 AM 5/19/2008 12:00:00 PM South side of Klystron Gallery Road blocked - May 19

 

Previous site access notices

Start End Details
1/1/2005 8:00:00 AM 5/15/2006 5:00:00 PM Loop Road Near Kavli Building Temporarily Closed
10/1/2005 8:00:00 AM 4/30/2006 5:00:00 PM The North Gallery Road Closed at Sector 20
3/27/2006 8:00:00 AM 6/15/2006 5:45:00 AM Alpine Gate Temporarily Closed
3/31/2006 8:00:00 AM 4/30/2006 5:00:00 PM Intermittent narrowing of Loop Road near bldg. 35 and 81
3/31/2006 8:00:00 AM 6/16/2006 6:00:00 PM Gate 17 Hours Exended During Alpine Gate Shutdown
4/3/2006 8:00:00 AM 6/1/2006 5:00:00 PM Short spur road off north access road closed
4/25/2006 8:00:00 AM 4/28/2006 6:00:00 PM PEP Ring Road Closure south of B750
5/2/2006 9:00:00 AM 6/1/2006 3:30:00 PM Sand Hill Road Construction
5/10/2006 8:00:00 AM 5/12/2006 5:00:00 PM Road between Bldg. 033 & 024 closed
5/19/2006 9:00:00 AM 6/2/2006 4:00:00 PM South Side of Gallery Closed
5/19/2006 4:00:00 PM 5/19/2006 8:00:00 PM Road to B035 and B081 and associated trailers temporarily closed
5/30/2006 5/30/2006 A&E ADA Restroom Renovation
6/2/2006 4:00:00 PM 6/4/2006 7:00:00 PM Power outage to building 81
6/3/2006 6/3/2006 Building 34 SLAC Women's Exercise Locker Room Closed
6/8/2006 8:00:00 AM 6/8/2006 5:00:00 PM Minor Loop Road Obstruction Today
6/19/2006 8:00:00 AM 8/21/2006 5:00:00 PM A&E ADA Restroom Renovation
7/10/2006 6:00:00 AM 7/11/2006 7:00:00 PM North Side of Sector 20 Closed Monday and Tuesday
7/17/2006 3:00:00 PM 8/18/2006 9:00:00 PM Bulb and Ballast Replacement in Bldg. 84 and 40
8/11/2006 8/31/2006 LCLS Construction Surveyors
8/16/2006 7:00:00 AM 9/13/2006 5:00:00 PM Road Closure - access to B062 (End Station B) parking
9/11/2006 8:00:00 AM 10/25/2006 5:00:00 PM Power Outages to Research Yard and SSRL
9/14/2006 5:30:00 PM 12/17/2006 5:00:00 PM Bldg 084 Parking Spaces Closure
9/15/2006 7:00:00 AM 12/17/2006 5:00:00 PM Bldg 084 GLAST ISOC facility construction
9/22/2006 6:00:00 AM 10/31/2006 9:00:00 PM Sector 10 Alignment Vault Access Road / North Gallery Utility Roads
9/26/2006 6:45:00 AM 9/26/2006 9:00:00 AM Power outage Trailers 207, 208, 275, 234
10/12/2006 8:00:00 AM 3/15/2007 5:00:00 PM Building 40 Construction
11/1/2006 11/15/2006 Outage - Building 34 Hot Water for Exercise Locker Rooms
11/3/2006 7:00:00 AM 11/7/2006 12:00:00 PM Power Outages in Research Yard
11/15/2006 8:00:00 AM 11/15/2006 11:30:00 AM Parking Limited in Lot C
11/17/2006 7:30:00 AM 11/18/2006 5:00:00 PM Power outage at the Collider Experimental Hall and B751
11/20/2006 8:00:00 AM 11/24/2006 5:00:00 PM South Gallery Road closed between Sector 20 & 21
11/27/2006 8:00:00 AM 12/7/2006 5:00:00 PM South Gallery Road closed between Sector 27 and Sector 29
12/4/2006 8:00:00 AM 12/20/2006 5:00:00 PM Intermittent delays along Loop Road
12/8/2006 8:00:00 AM 12/20/2006 5:00:00 PM North Gallery Road closed between Sector 26 and Sector 27
1/5/2007 1/15/2007 Painting project on Loop Rd.
1/9/2007 8:00:00 AM 1/9/2007 12:00:00 PM South side of Sector 19 temporarily closed
1/10/2007 8:00:00 AM 1/11/2007 2:00:00 PM South side of Sectors 2 and 28 experiencing intermittent delays
1/27/2007 8:00:00 AM 1/27/2007 5:00:00 PM A&E ADA Restroom Project
2/5/2007 8:00:00 AM 2/9/2007 5:00:00 PM North entrance to Building 41 parking lot closed
2/24/2007 7:00:00 AM 2/24/2007 3:00:00 PM North Linac Road will be closed at Sector 20 - Saturday Feb. 24
3/7/2007 7:30:00 AM 3/7/2007 9:00:00 AM South Gallery Road Closed at Sector 20
3/26/2007 6:00:00 AM 3/28/2007 5:00:00 PM Utility outage in PEP IR regions & Bldg 730, 750
3/26/2007 7:30:00 AM 3/28/2007 4:30:00 PM South side of linac closed between Sectors 2 and 28
4/19/2007 8:00:00 AM 4/21/2007 5:00:00 PM Tunnel Rescue Drill
4/23/2007 8:00:00 AM 4/23/2007 5:00:00 PM South Gallery Road Closed on Monday
5/4/2007 10:00:00 AM 5/4/2007 11:00:00 AM South Gallery Road Closed
6/21/2007 8:00:00 AM 6/21/2007 3:00:00 PM Road blockage at Sector 19 this Thursday
7/14/2007 7:00:00 AM 7/14/2007 8:00:00 AM Blackbox installation near Building 50
7/19/2007 6:00:00 AM 8/8/2007 5:00:00 PM Parking area east of 031, near 279, Closed for Construction
8/6/2007 8:00:00 AM 10/31/2007 5:00:00 PM Parking lot between B120 and B140 closed
8/15/2007 8:00:00 AM 8/15/2007 3:00:00 PM Sidewalk closed in front of Kavli, Bldg 051, for 3rd floor glass repair
8/17/2007 8:00:00 AM 8/19/2007 5:00:00 PM Building 027 Aerobics room floor repair
9/4/2007 7:00:00 AM 11/16/2007 5:00:00 PM Periodic closure of South Klystron Gallery Road - Cooling Tower Piping
9/4/2007 8:00:00 AM 9/4/2007 5:00:00 PM Major closures to SPEAR area, including parking lot, on Tuesday, Sept. 4
9/6/2007 8:00:00 AM 9/17/2007 5:00:00 PM Many Research Yard areas to lose power, Sept. 6 - 17
9/7/2007 8:00:00 AM 9/10/2007 5:00:00 PM No access to the SPEAR parking area - Sept. 7 & 10
9/13/2007 7:00:00 AM 9/13/2007 2:00:00 PM Road on the south side of linac closed at Sector 30 on Thursday
9/14/2007 8:00:00 AM 9/18/2007 5:00:00 PM North access road at sectors 24/25 blocked - Sept. 14, 17-18
9/18/2007 10:00:00 AM 9/18/2007 1:00:00 PM North linac access road closed at Sector 25 on Tues., Sept. 18
9/25/2007 7:00:00 AM 9/28/2007 3:00:00 PM South Gallery Road Closed at Sectors 29-30
9/25/2007 8:00:00 AM 9/28/2007 5:00:00 PM Increased traffic along north Linac access road, Sept. 25 - 28
9/26/2007 8:00:00 AM 9/27/2007 5:00:00 PM North Gallery Road closed to walkers and joggers - Sept. 26 - 27
10/9/2007 7:00:00 AM 10/10/2007 3:00:00 PM Sector 29-30 Road Closure
10/10/2007 10:00:00 AM 10/10/2007 3:00:00 PM Limited access on South Gallery Road at Sector 19 - Wednesday
10/11/2007 8:00:00 AM 10/11/2007 5:00:00 PM Loop Road lane closure Bldg 280 parking lot toFire Station.
10/26/2007 7:00:00 AM 10/30/2007 3:00:00 PM South Klystron Gallery Road CLOSED at Sector 29 - October 26, 29, 30
11/1/2007 12/31/2007 Construction for Seismic Upgrade of B 050 will start on Monday 11/5/2007
11/6/2007 8:00:00 AM 11/6/2007 5:00:00 PM Fire Fighter Low/High Angle Rescue Training in Research Yard Today
11/13/2007 8:00:00 AM 11/14/2007 5:00:00 PM Linac Access Road and both sides of Gallery Road closed to pedestrians
11/16/2007 7:00:00 AM 11/16/2007 1:00:00 PM B044 Parking Lot - Brief Closure
11/27/2007 10:00:00 AM 11/27/2007 10:30:00 AM Limited access to B015 and B245 parking lots on Tuesday
11/29/2007 7:00:00 AM 11/30/2007 5:00:00 PM Access to South Klystron Gallery Road limited on Thursday and Friday
12/3/2007 7:00:00 AM 1/11/2008 4:00:00 PM Construction on building #28 & Excavation from building #50 during shutdown
12/17/2007 7:00:00 AM 12/17/2007 2:00:00 PM South side of Gallery Road closed at Sector 26
2/7/2008 7:00:00 AM 2/8/2008 4:15:00 PM Tree trimming along South gallery road sectors 15-25 to impede traffic on Thursday
2/25/2008 7:30:00 AM 2/27/2008 4:00:00 PM One-way traffic on loop road near bldg 036, 026 accross bldg 82.
2/28/2008 6:00:00 AM 2/28/2008 3:30:00 PM SSRL parking along hillside
3/3/2008 7:30:00 AM 3/5/2008 4:00:00 PM One-way traffic on loop road near bldgs 036, 026 across Fire Station.
3/20/2008 8:00:00 AM 3/24/2008 5:00:00 PM Pipe rupture impairs fire protection water from Bldg. 730 to IR-6 complex
3/29/2008 7:00:00 AM 3/30/2008 5:00:00 PM Power Outage in Bldgs. 750 & 751 - March 29-30
5/12/2008 8:00:00 AM 5/12/2008 4:00:00 PM Gallery Service/Access Road closure
5/14/2008 9:30:00 AM 5/14/2008 1:30:00 PM Gallery Road Closed at Sector 14 on Wednesday


Last update: